Project

The first interventions in Valencia Bayer plant were aimed at improving security in its various aspects. It was built a new building with precast concrete structure and high impermeability special hearth for storing raw materials. The construction system made it virtually impossible to accidentally spill any toxic liquid to the outside.

http://www.bayer.es